九龍聖山(宋皇臺)遺址
資料來源:
- 古物古蹟辦事處
- 環境保護署
發掘報告
- "Shatin to Central Link - Tai Wai and Hung Hom Section: Archaeological Action Plan for Sacred Hill (North) Works Contract 1109 - Stations and Tunnels of Kowloon City Section", September 2012. (〈沙田至中環綫(大圍至紅磡段)聖山(北)考古計劃書〉,2012年9月。)
- "Brief on the Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) - Tai Wai to Hung Hom Section", December 2012. (〈沙田至中環綫(大圍至紅磡段)聖山(北)考古工作簡報〉,2012年12月。)
- "Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) - Tai Wai to Hung Hom Section", March 2013.(〈沙田至中環綫(大圍至紅磡段)聖山(北)考古工作進行期間出土宋元時期文物簡報〉,2013年3月。)
- "Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link - Tai Wai to Hung Hom Section", September 2013.(〈沙田至中環綫(大圍至紅磡段)聖山(北)考古工作進行期間出土宋元時期文物簡報〉,2013年9月。)
- "Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link - Tai Wai to Hung Hom Section", November 2013.(〈沙田至中環綫(大圍至紅磡段)聖山(北)考古工作進行期間出土宋元時期文物簡報〉,2013年11月。)
- "Brief on the Cultural Remains of Song-Yuan Period Discovered during Archaeological Watching Brief at the Launching Shaft Area of the Sung Wong Toi Station of Shatin to Central Link - Tai Wai to Hung Hom Section", April 2014.(〈沙田至中環綫(大圍至紅磡段)於宋王臺車站豎井範圍進行考古監察期間發現宋元時期文物簡報〉,2014年4月。)
- "Interim Report on the Archaeological Survey cum Excavation Findings in Sacred Hill (North) for Shatin to Central Link (Tai Wai to Hung Hom Section)", April 2014.(〈沙田至中環綫(大圍至紅磡段)聖山(北)考古調查暨發掘中期報告〉,2014年4月。)
- "Brief on the Sheetpile Proposal for Retaining T1 Area at the Launching Shaft Area, of the To Kwa Wan Station of Shatin to Central Link - Tai Wai to Hung Hom Section", May 2014.(〈沙田至中環綫(大圍至紅磡段)有關位於土瓜灣站豎井範圍T1區的板樁建議〉,2014年5月。)
- 吳震霖、金志偉、劉文鎖:〈香港九龍聖山遺址考古發掘簡報〉,《考古與文物》,2016年第6期,頁3-25。
- "Archaeological Excavation Report for Sacred Hill Area (Phases 1 to 3 Archaeological Works) for Shatin to Central Link - Tai Wai to Hung Hom Section (revised in June 2021)", June 2017.(〈沙田至中環綫(大圍至紅磡段)聖山區域最終考古報告(第一期至第三期考古工作)〉,2017年6月。)
- "Archaeological Report for Sacred Hill Area (Licence Nos. 409 and 424) for Shatin to Central Link (Tai Wai to Hung Hom Section)", August 2020.(〈沙田至中環綫(大圍至紅磡段)聖山區域考古報告(牌照編號 409 及424)〉,2020年8月。)
工作匯報
- 香港鐵路有限公司:〈沙田至中環線(沙中線)土瓜灣站考古調查及工程進展〉,2014年6月3日。
- 香港環境資源管理顧問有限公司:〈第三考古區的最新工作狀況〉,2014年6月4日。
- 香港環境資源管理顧問有限公司:〈第二及第三考古區發掘進度及最新發現〉,2014年9月16日。
新聞報道
- 〈立法會二題:在鐵路工地上發掘出的古蹟和文物〉,香港政府新聞公報,2014年5月21日。
- 〈立法會十五題:沙中線工程〉,香港政府新聞公報,2014年6月4日。
- 〈立法會十三題:在港鐵沙田至中環線工地發掘出的古物及古蹟〉,香港政府新聞公報,2014年6月18日。
- 〈沙田至中環綫(大圍至紅磡段)最終考古報告已獲接納〉,香港鐵路有限公司新聞稿,2017年7月14日。
- 〈土瓜灣站設展櫃融考古元素〉,《成報》,2017年7月15日。
- 〈文物探知館舉辦「聖山遺粹:啟德地區出土宋元文物展」〉,香港發展局新聞公報,2019年12月23日。